Prior to installation, it is the fabricator’s / builder’s / developer’s responsibility to ensure that all window frames are installed to meet the glazing requirements as laid out in AS1288.
Should the Sashless Window/s or any of their components cease to operate correctly, do not operate the Sashless Window/s and contact the Jewel Sashless office to organise a service call out.